Healthcare construction worker in hard hat reviewing blueprints inside a hospital under active renovation, steel studs framing a future patient room with blurred clinical signage visible in the background
Active Occupied Renovation
Healthcare Construction Specialists

Your Hospital
Stays Open.
We Guarantee It.

Fourteen years. Forty-seven occupied hospital projects. Zero ICRA breaches. We build in environments where a mistake isn't a delay — it's a patient risk.

Schedule Locked at Preconstruction
Zero ICRA Breaches — Guaranteed
Patients Never Know We're There
See ICRA Track Record

47

Occupied Projects

14

Years Zero Breaches

100%

Schedule On-Time

Guarantee #1

Zero ICRA Breaches
in 14 Years.

We don't just follow infection control protocol. We wrote the site-specific plan for 47 of them.

0

ICRA Breaches

Across 47 occupied projects spanning 14 years

2,840

Infection Control Inspections Passed

Third-party audited

100%

Negative-Pressure Rooms Certified

First-time pass rate

4.8M SF

Of Healthcare Space Delivered

All ICRA Class III & IV compliant

Healthcare construction site showing ICRA dust containment barriers and negative pressure monitoring equipment in a hospital corridor under active renovation

ICRA Class IV containment — Regional Medical Center, OR Suite Expansion, 2024

2025 Compliance Audit Results

Dust Containment100%
Negative Pressure Maintenance100%
Worker ICRA Certification100%
Daily Inspection Pass Rate98.7%

Third-party audited by Infection Control Partners LLC

Annual review · February 2026

"We had construction workers 40 feet from a live cardiac catheterization lab for six months. Foundwall's infection control was so disciplined, our clinical staff stopped asking for updates — they simply trusted the process."

DR

Dr. Rebecca Holt, CNO

Mercy Regional Health System · 340-bed facility

Ready to commit?

Your next capital project deserves
a builder who guarantees it.

ICRA Track Record →
Guarantee #2

Schedule Locked
at Preconstruction.

Before a single stud is framed, we lock your schedule in writing — phase by phase, floor by floor, with contractual penalties if we slip. No change-order surprises. No "we'll figure it out."

01

Preconstruction Schedule Workshop

We map every phase around clinical operations — shift changes, procedure volumes, ICU census peaks.

02

Contractual Lock-In

Milestone dates are written into the contract with defined remedies. You're not trusting our word — you're holding our bond.

03

Weekly Ops Coordination

Joint meetings with your Facility Director and charge nurses. Construction schedule bends to clinical reality, not the other way around.

"We've used five general contractors in twelve years. Foundwall is the only one that's never asked for a schedule extension."

MP

Marcus Patel, CFO

Covenant Health Network · $2.4B system

Construction workers reviewing blueprints and schedules on a hospital construction site with steel framework visible and safety equipment in use
Day 1 Preconstruction Meeting
ICRA Class IV

OR Suite Expansion

12 projects

100%

on-time delivery

Negative Pressure

ICU Wing Renovation

9 projects

100%

schedule compliance

Phased Occupied

ED Expansion

11 projects

0 days

operational impact

Active Facility

Mechanical Retrofit

15 projects

100%

first-pass inspection

Guarantee #3

Patients Never Know
We're There.

The people who matter most — your patients — should never feel the weight of your capital project.

"Construction workers were framing out a new ICU wing thirty feet from our NICU. We had zero particle count exceedances over four months. I've never seen a contractor take infection control this seriously."

SO

Dr. Sandra Okonkwo

Chief Nursing Officer

Lakeside Children's Hospital · 180-bed pediatric facility

"We greenlit a $47M OR expansion knowing the facility had to stay fully operational. The board wanted guarantees, not estimates. Foundwall gave us a locked schedule with contractual remedies. We came in on time and $200K under budget."

JW

James Whitfield

Chief Financial Officer

St. Augustine Regional Health · $1.8B system

"I've spec'd ICRA protocols on forty hospital projects. Most GCs treat it as a checklist. Foundwall treats it like a clinical protocol — daily verification, documented containment, real-time pressure monitoring. They speak the language fluently."

PN

Priya Nair, AIA

Healthcare Principal

Meridian Design Group · 200+ healthcare projects

"Phase two of our ED renovation required us to keep twelve treatment bays operational while demolishing the adjacent wing. Patients checked in, were treated, and discharged. None of them knew construction was happening six feet away."

TG

Thomas Guerrero

VP Facilities & Real Estate

Providence Health System · 6-campus network

"When I brought Foundwall in for our mechanical retrofit, they had already reviewed the infection control risk assessment before our first meeting. They came prepared with a phased containment strategy. That's when I knew they were different."

DM

Danielle Marsh

Director of Facilities

Northside University Medical Center

Scroll for more client voices

Ready to commit?

Your next capital project deserves
a builder who guarantees it.

ICRA Track Record →
Start Your Project

Get Your
Project Guarantee.

Tell us about your project. We'll respond within one business day with a preliminary scope assessment and a schedule feasibility analysis — at no cost.

We respond within 1 business day. No sales pressure — just a qualified assessment.

See Our ICRA Track Record

14 years of infection control audit results, compliance rates, and project case studies. 47 occupied hospital projects documented.

Why healthcare systems choose Foundwall

ICRA Class I–IV certified across all trades
Schedule locked in writing before groundbreak
Joint Commission-ready documentation, always
Dedicated hospital liaison on every project
24/7 emergency response for clinical disruptions

Prefer to call?

(312) 555-0190

Mon–Fri 7:00 AM – 6:00 PM CT